Choosing a methodological base for forming and accounting for the construction costs of a gas well at the final stage of field development

Authors

  • Valery A. Chejmatova Tyumen Industrial University, Tyumen, Russia.
  • Yuriy V. Vaganov Tyumen Industrial University, Tyumen, Russia

DOI:

https://doi.org/10.5377/nexo.v34i06.13140

Keywords:

hard-to-recover reserves, gas production, tectonic elements, Arctic regions

Abstract

The article introduces the problems of choosing a methodological base for forming and accounting costs during well construction, taking into account the intensification of gas inflow at the final stage of field development. The main methods that allow taking into account the costs of drilling operations are outlined. The main costs that need to be taken into account when designing fields with hard-to-recover gas reserves are identified and characterized. The main stages of cost formation by construction phases of a gas-producing well are shown, as well as the factors influencing the level and structure of the cost price during the construction of a well are highlighted. The authors consider the classification of cost accounting methods in the context of the comparison criterion and present the possible results of the correct choice of the cost formation method during the construction of a gas well at the final stage of its development.

Downloads

Download data is not yet available.
Abstract
417
PDF 288

Downloads

Published

2021-12-31

How to Cite

Chejmatova, V. A. ., & Vaganov, Y. V. . (2021). Choosing a methodological base for forming and accounting for the construction costs of a gas well at the final stage of field development. Nexo Scientific Journal, 34(06), 1740–1750. https://doi.org/10.5377/nexo.v34i06.13140

Issue

Section

Articles

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.