Involving 4th generation district heating technologies: residential buildings in remote areas of Russia

Authors

  • Sergey V. Glukhov Department of Thermal Power Engineering, Omsk State Technical University, Omsk, Russia
  • Mariya V. Glughova Department of Thermal Power Engineering, Omsk State Technical University, Omsk, Russia
  • Stanislav V. Chicherin Department of Thermal Power Engineering, Omsk State Technical University, Omsk, Russia
  • Andrey V. Zhuikov Department of Heat Engineering and Fluid Gas Dynamics, Siberian Federal University, Krasnoyarsk, Russia
  • Lyazzat R. Junussova Management and Entrepreneurship in Engineering, Almaty University of Power Engineering and Telecommunications, Almaty, Kazakhstan

DOI:

https://doi.org/10.5377/nexo.v35i02.14633

Keywords:

Heat, Energy, Pump, Demand, Electricity, Boiler, Substation

Abstract

This study aims to justify the possibility of expanding the energy and economic efficiency of a district heating [DH] system. The case study territory is a remote area of the Omsk region (Russia); the method is electric heating. To address this issue, we (1) considered the potential of modernizing these DH systems, (2) analyzed available options, (3) designed the main and auxiliary heat generation equipment, and (4) committed a feasibility study. The design heat consumption was 0.24 MW. To achieve this goal, we suggested two heat pumps; their capacity was 280 kW, and the investment required to install two heat pumps of 150 kW was 2.6 billion rubles. The total capital cost was 4.0 billion rubles. The annual effect after the heat pumps were installed was 0.7 billion rubles. The payback period was 5.6 years; to decrease it, one should install multiple heat pumps on the consumer side. The reason is to avoid heat distribution losses. Replacing traditional DH plants with electric boilers is feasible only if the cost of heat is 6,600 rubles per MWh or above. This cost has already been achieved for several DH plants. Ground source heat pumps are viable at lower prices, approximately 4,100 rubles per MWh. This option is especially helpful in remote areas of the Omsk region where the billing tariff is already high. When modernizing the heat supply infrastructure of the northern areas of the Omsk region, one can increase annual electricity consumption by 6%, decrease tariffs, and become more ecologically friendly at the same time.

Downloads

Download data is not yet available.
Abstract
281
PDF 274

Downloads

Published

2022-06-30

How to Cite

Glukhov, S. V. ., Glughova, M. V. ., Chicherin, S. V. ., Zhuikov, A. V. ., & Junussova, L. R. . (2022). Involving 4th generation district heating technologies: residential buildings in remote areas of Russia. Nexo Scientific Journal, 35(02), 541–551. https://doi.org/10.5377/nexo.v35i02.14633

Issue

Section

Articles

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.