“Choosing a Methodological Base for Forming and Accounting for the Construction Costs of a Gas Well at the Final Stage of Field Development”. 2021. Nexo Revista Científica 34 (06): 1740-50. https://doi.org/10.5377/nexo.v34i06.13140.