Designing a Budgeting Model in Crisis Management: Case Study of Power Generation Plants

Authors

DOI:

https://doi.org/10.5377/reice.v8i16.10709

Keywords:

Crisis Management, Planning, Programming, Budgeting System, Power Generation Plants.

Abstract

Important decision makings are always the imperatives of the crisis in the first moments, which, whatever the speed of decision-making by crisis management is greater, the speed of crisis control is greater. Since each organization is subject to various crises and power plants are no exception to this rule, to this end, the purpose of this study is to design a budgeting model for crisis management in a case study of power generation plants. In this research, we examine the relationship between crisis management steps and Planning, Programming and Budgeting System. A statistical population of this study is 60 managers of the power generation plants. The relationships between variables were tested using Smart-PLS software. The results of the model test showed that there is a significant relationship between budgeting dimensions and crisis management.The model fitness value is also numerically equal to 0.638, which is a strong index and indicates the overall high quality of the model.

Downloads

Download data is not yet available.
Abstract
545
PDF 504

Downloads

Published

2020-12-30

How to Cite

Karimi Jahromi, S., Sharif Malekzadeh, M., & Abbas Saleh Ardestani, A. (2020). Designing a Budgeting Model in Crisis Management: Case Study of Power Generation Plants. Revista Electrónica De Investigación En Ciencias Económicas, 8(16), 450–473. https://doi.org/10.5377/reice.v8i16.10709

Issue

Section

Research Articles